McAdoo Fire and EMS dispatched to
757 Claremont Ave, Rush Twp for a working structure fire. Quint
49-22 and Engine 49-15 responded with full crews. Quint 49-22
arrived on scene took the address. Engine 49-15 set up water
supply to feed Engine 25-10 and Quint 49-22. Multiple hand lines
pulled 1 3/4" and 2 1/2"s. Bulk of the fire initially on the A-D
side knocked down with a 2 1/2". McAdoo crew attempted a interior
attack of the fire with 1 3/4" line. Hometown crews worked to
ventilate the roof while crews worked inside and made access to
the attic where heavy fire was encountered. During the attack
heavy black smoke poured from the windows on the 1st division and
the attic. That's when crews were alerted via air horns to
bail from the building and roof. After everyone was accounted for
Quint 49-22 went into ladder pipe operations. bulk of the fire
knocked down and overhaul in progress now. Ppl on scene to cut the
power. Multiple tankers brought in for water supply which were
filled at a hydrant by Tamaqua fire. Fire initially came in with
entrapment but that was not the case all occupants out of the
residence when crews arrived. Orgin of the fire is unknown till
fire investigators talk to the family. Crews were on scene for
over 2 hrs.